Factory
WHI has contracted with a reputable and experienced equipment manufacturing company that will manufacture the equipment to WHI’s specifications. Each factory will be responsible for supplying the pre cut roof, exterior walls, and interior walls that make up each home kit as well as distributing the WHI resins and other ancillary items to the licensee’s customers. Each factory depending upon volume can support as many as 100 certified factory-trained builders. Conservatively speaking, each premium factory may be equipped to manufacture enough blocks to produce many as 18 - 480 square foot home packages per 8-hour shift. To meet those projections, staffing for each 8-hour shift would consist of 1 supervisor and up to 25 laborers. Additional shifts and staff would be necessary to increase production beyond the single 8-hour shift projection. To increase output above the maximum projections additional equipment and warehouse space could be added.

All combined and based upon the equipments maximum output projects during a 24 hour period, as many as 15,000 “home kit” sized at 480 square feet (20’ x 24’) could be manufactured annually.

A suggested interior square footage amount of 50,000-80,000 square feet will be required to house the manufacturing equipment and assembly areas, and ceiling heights no less than 25’ to the bottom of the roof truss. The facility should have exterior space for future covered work and storage area as well as several loading docks, including utilities such as water, sewer, electric, and natural gas hook-ups (if available)

The initial investment for a complete turnkey manufacturing facility including equipment, inventory, and start up, costs (excluding land, duties, taxes and building) is estimated to cost approximately $1.6 million dollars U.S. and such costs may be adjusted according to equipment needs, and local conditions. Depending upon local conditions, equipment delivery is 100 days from receipt of down payment. Payment terms are 50% down, 40% at shipment and 10% at start up.